Sitemap
En
Press Release
Current Location: Home > Press Release > Media Coverage

Tianjin-Weifang High-Speed Railway’s Jingu Haihe Tunnel Project under Construction

05-20-2025
Source:Xinhua

图片.png

An aerial drone photo taken on May 19, 2025 shows the construction site of the Tianjin-Weifang High-Speed Railway’s Jingu Haihe Tunnel project in north China’s Tianjin. A giant tunnel boring machine successfully crossed the Haihe River in the Tianjin-Weifang High-Speed Railway’s Jingu Haihe Tunnel project, with a cumulative excavation distance exceeding 5,000 meters.

The Tianjin-Weifang High-Speed Railway starts from the Binhai Station in Tianjin and terminates at the Weifang North Station, with a total length of approximately 348 kilometers and a designed speed of 350 kilometers per hour. The Jingu Haihe Tunnel, which is about 6.7 kilometers long, is the only tunnel along the entire railway line with a maximum excavation diameter reaching 13.8 meters. 

TOP
Website Identification Code: 1201160062

Are you sure you want to leave this page?